Kyeryong Construction Wins Grand Prize in OSC Modular Category at 2026 BIM Awards...Third Consecutive Win
- Input
- 2026-11-24 16:57:50
- Updated
- 2026-11-24 16:57:50

[Financial News] Kyeryong Construction won the grand prize at the 2026 BIM Awards for its building information modeling (BIM) technology applied to an apartment project in Sejong City’s Multifunctional Administrative City. The win marks its third consecutive year receiving an award, beginning in 2024.
According to Kyeryong Construction on the 24th, the apartment project in L5 Block, District 5-1 of the Multifunctional Administrative City, being built by a consortium of Kyeryong Construction, Hyundai Engineering and KR Industry, won the grand prize in the OSC modular category at the 2026 BIM Awards, held that day at the Seoul Professional Construction Hall.
The BIM Awards is a competition organized by the BuildingSMART Association since 2009 to identify and recognize outstanding cases of BIM technology use.
With this win, Kyeryong Construction has now received BIM Awards for three consecutive years, following an excellence award in 2024 for Pyeongtaek Arts Center and the grand prize in the construction category in 2025 for Daejeon Hanwha Life Ballpark.
The award-winning apartment project in L5 Block, District 5-1, is Korea’s largest modular apartment project, with 450 of its 1,327 units to be built using modular construction. It combines reinforced-concrete and modular construction methods.
Kyeryong Construction established an integrated management system using BIM, covering everything from design and factory production to on-site installation and maintenance.
In particular, before modular production, the company reviewed physical mock-ups and production processes and simulated transportation and loading to identify in advance potential errors in construction. The effective integration of BIM-based management and modular construction was recognized as a key achievement behind the award.
Kyeryong Construction has earned recognition for its competitiveness in modular apartments, ranking first in the industry for its track record leading LH modular projects.
Kyeryong Construction previously completed 416 units in Blocks UR1 and UR2 in District 6-3 of the Multifunctional Administrative City as part of a pilot modular apartment project by the Korea Land and Housing Corporation (LH). By undertaking the District 5-1 project as well, it is expanding its experience in modular apartments.
Kyeryong Construction is also pursuing participation in the ‘Goyang Changneung A-3BL’ apartment project, which comprises 2,374 units in total. Of those, 668 units are planned to use modular construction.
Kyeryong Construction plans to draw on the technology and experience gained from its previous modular projects to address areas for improvement identified in those projects, further develop its strong construction techniques and apply them to Goyang Changneung A-3BL.
Kyeryong Construction plans to combine its accumulated project experience with its BIM-based design and construction management capabilities to raise the technical standards of modular construction and continually expand the scale of its projects and the scope of their application.
A Kyeryong Construction official said, "We will actively incorporate improvements identified in previous projects and our accumulated know-how into follow-up projects to advance modular technology to the next level," adding, "We will work to contribute to the growth of Korea’s modular construction industry."
[email protected] Choi A-young Reporter