Shinsegae Engineering & Construction Wins Grand Prize at 'BIM AWARDS 2026'... Recognized for BIM Innovation
- Input
- 2026-11-24 15:34:17
- Updated
- 2026-11-24 15:34:17

[Financial News] Shinsegae Engineering & Construction Co., Ltd. won the grand prize at 'BIM AWARDS 2026' for its building information modeling (BIM) technology applied at the Starfield Cheongna construction site.
According to Shinsegae Engineering & Construction Co., Ltd. on the 24th, it won the grand prize in the construction category and the special Trimble Award at the 'BIM AWARDS 2026' ceremony hosted that day by the BuildingSMART Association. The winning entry was 'LIFT-UP X BIM TECHNOLOGY,' carried out jointly with BIM Factory Co., Ltd.
The winning entry centers on a BIM-based integrated design and construction management system applied at the Starfield Cheongna site, which is currently under construction.
Starfield Cheongna is a large-scale mixed-use development combining a multi-stadium, a hotel, a shopping mall and an infinity pool, among other facilities. Special stage equipment, HVAC systems, catwalks and digital media facilities are concentrated inside a roof structure approximately 60 meters high, making this a site where the complex design and construction processes require advance review.
From the early Pre-Con stage of the project, Shinsegae Engineering & Construction Co., Ltd. used BIM to compare and review construction sequences and equipment plans for different methods. Based on this, it selected the 'full lift-up' method, which can reduce work at height and allow the construction schedule to be adjusted.
The technology was also used to prepare BIM-based preliminary construction cost estimates and value engineering (VE) proposals through reviews of design alternatives.
During construction, BIM modeling was applied across all trades. The company also established a system to review potential clashes in the mechanical, electrical and plumbing (MEP) fields in advance and classify them into three levels: severe, moderate and minor.
This improved design quality, shortened review periods and sped up decision-making. The company also set up a dedicated BIM team on site and established an integrated collaboration system among the client, design firm, construction manager (CM), contractor and partner companies.
Shinsegae Engineering & Construction Co., Ltd. is driving digital transformation across schedule, quality and safety management by applying a range of smart construction technologies at its sites, including BIM at the core, along with 4D construction simulations, 3D scanning, automated drones and augmented reality (AR).
Shinsegae Engineering & Construction Co., Ltd. is raising safety and quality standards by continually expanding its use of smart construction technologies optimized for each project's characteristics and site conditions. It is also maximizing project execution efficiency to build differentiated technological competitiveness.
A Shinsegae Engineering & Construction Co., Ltd. official said, “This grand prize recognizes our achievement in using BIM not merely as a 3D modeling tool but as a decision-making platform throughout the entire design, construction, safety and quality process,” adding, “We will extend companywide the know-how in operating BIM and smart construction technologies gained at the Starfield Cheongna site, and lead the digital transformation of the construction industry by establishing a next-generation construction management system that integrates AI and digital twin technologies.”
[email protected] Choi A-young Reporter