Thursday, November 19, 2026

As Move-Ins to 3rd-Generation New Towns Are Delayed... Existing New Towns With Transit and School Districts Gain Appeal

Input
2026-11-18 14:42:52
Updated
2026-11-18 14:42:52
Artist’s rendering of Gwanggyo Jayeon& Centerville. Courtesy of RealToday

[Financial News] As main subscription and move-in schedules for 3rd Generation New Towns fall behind their original plans, newly supplied housing in existing new towns with established everyday infrastructure—including transit, education and commercial facilities—is drawing the attention of end-users.
According to the housing sales industry on the 18th, main subscription and move-in schedules at major 3rd Generation New Town project sites—including Wangsuk in Namyangju-si, Gyosan in Hanam, Changneung in Goyang and Daejang in Bucheon—are now about one to three years behind the plans laid out at the time of pre-subscription.
The delays have been affected by land compensation, the relocation of existing residents and consultations over the removal of structures and other obstacles on the sites. The addition of environmental and administrative procedures during site preparation, as well as the increased burden of construction costs due to rising prices for raw materials and labor, is also believed to have affected project progress.
Another factor is the “initial infrastructure gap” that can persist even after the first residents move in, until the city’s functions are fully established. In new towns, housing move-ins, the opening of metropolitan transit networks, and the development of schools and commercial facilities may not happen at the same time.
New housing in existing new towns, where major infrastructure is already in place, is therefore being cited as an alternative. One prominent example is Gwanggyo New Town in Gyeonggi Province.
Gyeonggi Housing and Urban Corporation (GH) and Dongbu Construction are supplying Gwanggyo Jayeon& Centerville in the vicinity of 633 Woncheon-dong, Yeongtong District, Suwon-si. The complex will have two basement levels and up to 20 floors above ground, with a total of 600 units: 360 public-sale units with an exclusive area of 84 square meters and 240 equity-accrual units with an exclusive area of 59 square meters.
Existing amenities near the complex include Gwanggyo Jungang Station on the Shinbundang Line, Gwanggyo Lake Park and Lotte Mall. The price ceiling system applies, and the equity-accrual model is a supply method that GH is introducing for the first time in the country.
Subscription schedules vary by housing type. Winners for the 84-square-meter public-sale units were announced on the 17th, and contracts will be signed from December 21 to 23. Winners for the 59-square-meter equity-accrual units will be announced on the 18th, with contracts scheduled to be signed from January 25 to 27 next year.
New supply is also planned near Ilsan New Town. POSCO E&C plans to introduce The Sharp Ilsan Centro in Pungdong 2 District, Ilsandong District, Goyang, Gyeonggi Province.
The complex will have two basement levels and up to 29 floors above ground, with seven buildings and 526 units in total. Of these, 229 long-term general private-rental housing units will be offered first.
The surrounding area includes the commercial district of Pungdong District and Pungdong Anygol Food Culture Street. Educational facilities such as Pungsan Elementary School, Pungsan Middle School and Pungdong High School are nearby, and green spaces including Ilsan Lake Park and Pungdongcheon are also accessible.
Elsewhere, Geomdan AA17BL in Incheon Geomdan New Town is slated to go on sale within the year. In Gunpo, Gyeonggi Province, the Gunpo District 10 redevelopment project, adjacent to the Sanbon New Town living area, is set to be supplied. ELIF Godeok Central High is also slated for sale in Pyeongtaek Godeok International New Town.

[email protected] Choi A-young Reporter