Tuesday, November 17, 2026

“Boosted Openness Inside and Out” ... Hanwha Forena Jije Station Features Glass Railings, a Central Plaza and More in Its Exterior Design

Input
2026-11-17 09:49:32
Updated
2026-11-17 09:49:32
The Forena Chevron Curtain Wall Look shown on a scale model of the Hanwha Forena Jije Station complex. Courtesy of Hanwha Forena Jije Station

[Financial News] Hanwha Corporation E&C Division will incorporate curtain-wall-look façades and windows with integrated glass railings, among other features, in Hanwha Forena Jije Station, which it is supplying in Segyo-dong, Pyeongtaek, Gyeonggi Province. It plans to create a residential landmark in Pyeongtaek through specialized design.
According to Hanwha Corporation E&C Division on the 17th, the exterior of Hanwha Forena Jije Station will feature the ‘Forena Chevron Curtain Wall Look.’ The design combines glass and metal to create the appearance of a curtain wall, setting it apart from the standard painted finishes used on apartment buildings.
Architectural lighting will be installed in some areas where the glass finishes meet. The design will highlight the textures of the metal and glass during the day and use lighting patterns to create a visual effect on the building’s exterior at night.
Windows with integrated glass railings will be installed in the living rooms of all units. Replacing conventional steel railings with transparent glass railings integrated into the windows will enhance the sense of openness.
The complex’s layout is also designed to create a sense of openness. It will include a spacious central plaza and generous spacing between buildings. Landscaping features and pedestrian paths will be placed around the plaza so residents can use the area for walks and relaxation.
Hanwha Forena Jije Station will be built in the area around 725 Segyo-dong, Pyeongtaek, Gyeonggi Province. The complex will comprise 12 buildings, with two basement levels and up to 27 floors above ground, and a total of 1,098 units with exclusive-use areas of 84 and 116 square meters. Occupancy is scheduled for November 2029.
[email protected] Choi A-young Reporter