Sunday, November 22, 2026

Chuncheon City Nears End of Soyang Water Intake and Treatment Plant Assessment; 575 Million Won Invested

Input
2026-11-15 10:07:23
Updated
2026-11-15 10:07:23
View of the Soyang Water Treatment Plant in Chuncheon. Provided by Chuncheon City

【Financial News, Chuncheon = Kim Gi-seop, reporter】The Soyang Water Intake Plant and Soyang Water Treatment Plant, which supply tap water to Chuncheon residents, are entering the final stretch of a detailed health checkup that has lasted more than six months.
According to Chuncheon City on the 15th, the city is reviewing the final results of a technical assessment of the Soyang water intake and treatment plants, which began in April and cost 575 million won. The assessment will be completed early next year. The Soyang Water Intake Plant draws in 165,000 cubic meters of raw water a day, while the Soyang Water Treatment Plant filters 133,000 cubic meters a day, making them key facilities in Chuncheon’s water supply system.
The assessment covers structures at the water intake and treatment plants, as well as machinery, electrical systems, and instrumentation and control equipment. It examines how much the facilities have deteriorated, whether there are any safety issues, and whether the equipment is being maintained while performing as intended. It also checks whether the water treatment process is running properly. By estimating how many more years the major equipment can be used, the assessment will identify facilities that need repairs or replacement.
After the assessment is complete, the city plans to rank facilities by priority for improvement based on the findings and draw up a phased maintenance plan. The plan will be incorporated into projects to upgrade aging facilities and into the maintenance plan, so the city can address the most urgent facilities first and reduce wasteful spending.
A Chuncheon City official said, “If we estimate in advance how long the major equipment can keep operating, we can take action before it breaks down,” adding, “We will repair, one by one, the facilities where the assessment has revealed problems so that residents can drink tap water with confidence.”

[email protected] Kim Gi-seop Reporter